Compare 3RW55 and VKS8000 by motor FLA, starting duty, bypass, torque/adaptive control, motor protection, communications and event logging.

Short answer

What does this page recommend?

A technical alternative, not a drop-in substitute

VKS8000 is an advanced start/stop candidate for pumps, fans, compressors or conveyors, but a 3RW55 selection cannot be converted by motor kW alone. Motor FLA, load torque/inertia, starting time and starts per hour are recalculated.

Veikong

ProControl products to evaluate first

The exact configuration is selected after engineering review.

VKS8000
Veikong

VKS8000

Candidate with built-in bypass and advanced start/stop options; selection is based on motor FLA and starting duty, not motor kW alone.

Open technical page
VKS6000
Veikong

VKS6000

More basic soft-starter family; current, duty cycle, bypass architecture and protection scope are verified before design.

Open technical page
Technical comparison

Similar requirement, different architecture

The table explains product architectures; it is not an exact order-code selection.

Validation areaSiemens SIRIUS 3RW55Veikong / ProControl candidate
Selection basis3RW55 selection uses motor rated current, load class, starting current/time and repetition count.The VKS8000 model table is selected against the same FLA and starting duty; VKS6000 is assessed separately only for more basic functional needs.
Bypass topology3RW55 internal bypass architecture, thermal duty and connection method depend on exact-device documentation.VKS8000 is published with built-in bypass; contactor current, bypass transition, fault behaviour and heat loss are tested.
Start/stop modeSiemens 3RW55 offers torque control and advanced methods for difficult starts.VKS8000 voltage, current-limit, torque and adaptive-start options are tuned on the load; identical names do not mean identical algorithms.
Motor protection3RW55 uses a motor thermal model and sensor-based protection according to configuration.VKS8000 is assessed for over/undercurrent, stall, phase and temperature protection; exact PTC/PT100 input wiring is verified.
Communications and HMI3RW55 can integrate into Siemens automation using PROFINET and other communication modules.VKS8000 connects through Modbus and published communications options; PROFINET requires evidence for the official card/device file.
Logging and maintenance3RW55 diagnostics, events and parameter management are handled with Siemens tools.VKS8000 LCD, event log and parameter upload/download are tested in the maintenance scenario; historical data format is not transferred.
Suitable scenario

When is it worth evaluating?

  • Pumps, fans and compressors with long starts
  • Current-limit and controlled-stop retrofits on conveyors or crushers
  • New panels requiring Modbus monitoring and built-in bypass
Migration gate

Before making a decision

  1. Record motor FLA, service factor, connection and insulation class.
  2. Calculate load-torque curve, inertia, required starting time and starts per hour.
  3. Document 3RW55 bypass, inside-delta, sensor and communications use.
  4. Verify VKS8000 exact current/voltage code plus thermal and protection settings.
  5. Run cold/hot motor starts, stall, phase-loss and emergency-stop tests under load.
Frequently asked

Clear answers about alternatives and migration

Is this a drop-in replacement?

No. It is not a direct substitute until exact model, electrical, protocol-role, mechanical, software and certification checks pass.

What should I provide for selection?

The exact existing code, diagram or I/O list, PLC/network data, supply, environment and special functions in use.

Is the same motor kW rating enough to select a VKS8000 model?

No. Motor FLA, mains voltage, load torque, starting time/current, starts per hour, ambient conditions and bypass duty must be calculated together.

This content compares manufacturer-published data under the same project requirement; it does not guarantee direct substitution or project compatibility. ProControl engineering must validate exact model, revision, protocol, electrical, safety and environmental conditions.

Validate the match with an engineer

Share the exact existing code, I/O list, network and environment so we can identify the right solution without assumptions.

Talk to ProControl